Description
This pant has following features:
- Adopting modularizationdelivery, each system is skid into modules, all piping of fractionation column is completed, just need to connect on job site.
- With round cold box structure, better wind-resistance ability.
- High oxygen recovery rate.
- Low power consumption of products, lowest power consumption in equal running plants.
- Short start-uptime of plant, after first time successful commissioning, only 30 hours are needed for plant to output qualified products.
26000 Level Air Separation Unit
Job site: Henan, China
Plant name:26000Nm3/h Internal Compression ASU
Characteristic: Assembled round cold box. One time successful commissioning start up.